Tidewater Logistics Center, a premier Class A speculative industrial park, will be constructed in two phases. Phase I construction is set to commence in early 2024 and will include three buildings totaling 863,520 square feet. Planned Phase I building specifications are detailed below and can be tailored to fit Tenant’s needs. Please reach out to the leasing team to discuss the flexible site layouts that are available in Phase II.
PROPERTY OFFERINGS
For more information, contact:
GEOFF POSTON, SIOR
757 650 8437
[email protected]
BRETT SAIN
757 213 4153
[email protected]
ELLIS COLTHORPE
757 213 4160
[email protected]
GEOFF POSTON, SIOR
757 650 8437
[email protected]
BRETT SAIN
757 213 4153
[email protected]
ELLIS COLTHORPE
757 213 4160
[email protected]
Independently Owned and Operated / A Member of the Cushman & Wakefield Alliance
Cushman Wakefield | Thalhimer © 2023. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions, imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question.
Cushman Wakefield | Thalhimer © 2023. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions, imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question.